Panelized wall, floor and roof systems — Sault Ste. Marie, Ontario

More in the factory. Faster in the field.

Certainty is the product. Panels are how we deliver it. We move coordination,
repetitive labour and quality control earlier in the process — when changes are still inexpensive to make.

Where should we start?

Two different jobs, two different sets of answers. Pick your path.

FOR BUILDERS & DEVELOPERS

I'm routing framing to a supplier

Certainty on cost, time, field execution and performance — plus the developer economics, the mass-timber comparison and how a panel package is scoped.

FOR HOME BUYERS & COMMUNITIES

I'm building my own home

Models from the Elly at 448 sq ft up to the two-storey Tyler, with shell and turnkey pricing and what a net zero-ready home costs to run.

R33–R50+

Wall assembly R-value range

R48–R75

Wall assembly R-value range

45–90

Wall assembly R-value range

80%

Wall assembly R-value range

Assembly values are project-configured. Proposed schedules are subject to project readiness, approvals, site conditions and final scope.

Projects & programs

Where the platform is being put to work.

PURPOSE-BUILT RENTAL

Northern Living Lab — Queen & McPhail

A 10-unit net-zero-ready boutique rental demonstration: rooftop amenity, solar canopy, EV- ready parking and measuredbuilding performance.

MULTIFAMILY INFILL

12-unit missing-middle infill

Floor, exterior-wall and roof panels packaged with insulation, metal finishes, windows and doors — a 45–90 day proposed window on 9,600 sq ft.

INDIGENOUS HOUSING

WIK Homes — Walking in Kinship

An optional community delivery stream: local members take an active role in assembly and leave with practical, certified construction skills.

More in the factory. Faster in the field.

Panel joints, floor edges, openings, bearing conditions, roof
transitions and MEP routes are coordinated digitally before
fabrication. That means fewer RFIs, less field rework and fewer
decisions left to crews working under schedule pressure.

How a project moves forward

A scalable path from one home to a phased housing program.

1

Confirm program

Select model(s), quantity, occupancy needs, budget target and preferred delivery scope.

2

Review site

Confirm survey, access, servicing, foundation strategy, local authority and climate requirements.

3

Adapt & freeze designs

Complete architectural, structural and MEP coordination and finalize permit ready drawings.

4

Procure & manufacture

Order common materials and fabricate repeatable assemblies in GLM’s controlled Sault Ste. Marie facility.

5

Prepare sites in parallel

Advance foundations, access and services while the building components are manufactured.

6

Deliver, assemble & complete

Sequence transport and erection based on site readiness, then complete the agreed shell or turnkey scope.

Why panelized

Schedule compression

Panel production runs in parallel with foundations and servicing. Once foundations are complete, the structure can be erected in days rather than weeks.

Cost certainty

Accurate material quantification through BIM and CAD modelling, early identification of design conflicts, and significantly fewer change orders.

Consistent quality

Cutting data, assembly tables, jigs and documented checks reproduce the same details across every unit, indoors and out of the weather.

Less site labour

Floor cassettes create immediate
working platforms, reducing work at-height exposure and the crew size needed during structural erection.

THE FACILITY

100 White Oak Dr E, Sault Ste. Marie

Automated systems and the Simpson Strong-Tie EasyFrame saw, indoors and climate-controlled. Every panel is precision-cut, assembled and checked before it leaves the building.

Sault Ste. Marie gives GLM Northern Ontario reach, practical access to Southern Ontario, proximity to rural and resource communities, and a direct international border for future growth.